Tower 3
DoneOn planBehindNot startedNot dueTo walk
Loading the programme items…
4D: what the walk found vs the programme
Loading the 3D model…
Drag to turn, pinch or scroll to zoom. Tap any floor, façade or lift to see the walk against the programme, then press Walk it to fill it.
By trade, areas in the walk
Actual = latest % typed in the walk, average of the items in each area. Programme % = what was done at 20 Nov (from the walk) plus the share of the remaining work that programme says is done by the walk date. Same areas in every column.